Safe Milk Labs

Creating a Risk Register for the Dairy Industry Amidst the Meta Crisis

risk register dairy meta crisis dairynews7x7

Globally , Ist Jun is celebrated as World Milk day. Dairy is a globally essential food source, consumed by over 80% of the world’s population. It provides vital nutrients for people of all ages, supports millions of livelihoods through dairy farming, and contributes significantly to national economies in many countries. Happy World Milk Day to everyone!

Today, the world is experiencing a profound meta crisis, born from the unseen consequences of unchecked growth. Humanity is on a perilous path toward self-destruction. Across the globe, nations are embarking on mega projects with narrow objectives, failing to consider the broader picture that includes environmental and socio-economic impacts. The same applies to agriculture and livestock, where the quest for improved productivity and cost reduction through emerging technologies like AI and IoT is leading to farm-less or farmer-less farming.

Today, let’s pause to envision the potential risks this short-sighted approach holds for our dairy sector. Our relentless pursuit of growth, without regard for the environment and changing societal dynamics, threatens the very foundation of our existence.

Meta Crisis

The meta crisis we face seems inevitable as humanity evolves into superorganisms driven by narrow goals. Our relentless pursuit of extraction, conquest, and the destruction of diverse cultures, species, and ecosystems is setting the stage for an impending disaster. In essence, mankind is unwittingly crafting the conditions for its own extinction.

It’s time to establish a risk register for our dairy industry, focusing on the critical factors that will shape its future. Key considerations must include the impact of climate change, biodiversity loss, the quest for cheaper cow-less dairy alternatives, emerging lifestyle fads, and the shift towards non-farm activities. Let’s delve into each of these aspects.

Climate Change

According to the FAO, livestock is a major source of methane emissions. For every gram of milk protein produced, there are significant CO2 equivalent emissions—404 grams and 87 grams for buffaloes and cows, respectively. However, livestock also plays a crucial role in sustaining farmers globally. In India, livestock contributes nearly one-third of the total agricultural gross value addition.

With India’s smallholder farming model, targeted efforts such as climate resilient breeding, balanced rations, methane blockers, and open grazing can effectively control these emissions. Let’s follow the global solutions to this crisis, as shared by the FAO.

Loss of Bio diversity

The environmental footprint of dairy farming is a growing concern due to biodiversity loss and significant resource consumption. Reducing dairy intake could save an estimated 19 billion cubic Meters of water annually, which is about 1.7% of India’s total water availability. Additionally, it could free up 460 billion square meters of land each year, equivalent to the area of Spain or 32 billion trees.

Despite these environmental concerns, dairy remains a crucial source of nutrition. Animal products provide 18% of our calcium and 39% of our protein intake. Milk, in particular, is an excellent source of essential micronutrients such as Vitamin B12, galactose, phosphorus, potassium, and Omega-3 fatty acids.

Adopting best practices for manure management and implementing good dairy farming practices can significantly mitigate these environmental issues. By balancing sustainable practices with the nutritional benefits of dairy, India can continue to thrive in the dairy sector while minimizing its environmental impact.

Quest for Cheaper food for large population

Population growth presents a formidable challenge worldwide. In 1813, the global population was 1 billion. By 1913, it had increased to 1.5 billion, and by 2013, it surged to 7.5 billion. Projections now estimate that by 2113, the global population could exceed 12 billion.

According to a recent United Nations report, the demand for food to support this burgeoning population will increase by 50% by 2050 compared to 2012. To meet this demand, an additional 165 to 600 million hectares of land will be required for crop and livestock production. Alarmingly, much of this land is currently occupied by forests and other vital ecosystems.

In India, which houses 15% of the world’s cattle and 60% of its buffaloes, we face a significant challenge: a 10% shortfall in total arable land needed for fodder. This scenario has driven substantial investments towards cow-less farming, leveraging economies of scale to reduce costs. Our research indicates that 2,000 precision fermentation laboratories could meet the daily per capita demand of 250 ml for the entire global population.

While the final products of such innovative methods might lack some bioactive components of traditional milk, the unsustainable nature of conventional farming, combined with investments in disruptive technologies and a shift towards more environmentally friendly and cost-effective alternatives, may catalyze a paradigm shift in the dairy industry.

It is crucial to transform dairy into a truly sustainable business, benefiting all stakeholders involved.

Emerging Food choices as Fads

Despite vegans representing only 1-2% of the global population, veganism is one of the most discussed lifestyle trends today. For many youth, it has become a way of life, particularly in India where fitness and health consciousness are on the rise. Veganism, with its focus on plant-based foods, often feels like a path to better health and well-being.

Many claims highlight the benefits of plant-based diets, such as improved heart health, reduced stress, and lower blood pressure. However, some studies point out potential deficiencies in vital nutrients like vitamin B12, iron, calcium, iodine, choline, and omega-3 fats, especially during critical life stages like pregnancy.

The conversation around diet shouldn’t be about choosing sides but about creating a balanced food plate that includes both plant and animal sources, consumed in moderation. The future of dietary habits will likely see a rise in flexitarians—those who primarily follow a plant-based diet but also incorporate animal products occasionally—reflecting a more inclusive and sustainable approach to nutrition.

 

 

 

Advertisement · Scroll to continue

Migration

Distressed migration is a critical issue that could impact our plans for the future of farming, including dairy farming. In India, the youth are increasingly disinterested in farming as a career, opting instead for urban-based vocations. This shift is fueled by better education and the allure of more lucrative opportunities in urban areas. Poor returns from farming, including dairy farming, make it an unattractive proposition.

The rapid rate of urbanization further lures rural youth towards the service sector. Despite these challenges, India is performing exceptionally well in the dairy sector. While some large countries in the developed world are experiencing a decline in dairy, India is maintaining its momentum.

The onus is on policymakers to make dairy farming appealing to all stakeholders through awareness, capacity building, financial support, and appropriate technological interventions. By doing so, dairy farming can be seen as more than just a livelihood opportunity—it can become a thriving and sustainable career choice.

In conclusion, I extend my gratitude to my mentor in the alternative education space, Mr. Manish Jain, for bringing the issue of the meta crisis to my attention. His guidance prompted me to identify the critical areas that could reshape the dairy industry. In a world where the rapid pace of technological advancement leads to some technologies replacing others or becoming obsolete, understanding these factors is crucial. This is just the beginning of my exploration, and I will continue to investigate more elements that might influence the future demand for dairy. I invite all of you to share your insights and suggestions on what should be added to the risk register of this meta crisis in the dairy domain. Together, we can better navigate the challenges ahead.

 

Share :

Read Next

Sorry, your ID is maybe not correct (If you did not place any ID that means auto-detect does not work.). And please make sure that your selected element is developed with Swiper.